London Daily

Focus on the big picture.
Saturday, Nov 08, 2025

HS2 rail extension to Leeds scrapped amid promise to transform rail

HS2 rail extension to Leeds scrapped amid promise to transform rail

The government has scrapped the Leeds leg of the HS2 high-speed rail line as part of a package that ministers promise will transform services.

The prime minister said the overhaul would mean faster travel up to 10 years earlier than planned, and said claims of broken promises are "total rubbish".

The package won support from some business leaders, and anti-HS2 groups.

But Boris Johnson faced criticism that he had reneged on investment promises to the Midlands and north of England.

The axing of a new East Midlands-Leeds high-speed line, with HS2 trains now to run on existing upgraded routes, and a scaling back of the Northern Powerhouse Rail (NPR) project, drew strong condemnation.

Labour leader Sir Keir Starmer said Mr Johnson had "ripped up" promises he made that HS2 would go all the way to Leeds and that there would be a new NPR line from Manchester to Leeds.

"This was the first test of 'levelling up' and the government has completely failed and let down everybody in the North. You can't believe a word the Prime Minister says," he said.

There was also criticism that a significant portion of the £96bn pledged as new investment has already been announced, such as £360m to improve ticketing.

On a visit to a Network Rail logistics hub near Selby, Mr Johnson dismissed the charges of broken promises as "total rubbish", insisting the government would deliver on them "eventually".

"Of course there are going to be people who always want everything at once. And there are lots of people who are [going to] say, look, what we should do is carve huge new railways through virgin territory, smashing through unspoilt countryside and villages and do it all at once," he said.

And in a BBC interview later the prime minister said that laying new track through countryside would take decades to complete.

Mr Johnson said: "You can wait decades and dig up virgin countryside and plough through villages, but you have to wait an awful lot longer and it costs an awful lot more.

"I'm afraid that we are going to be building a huge amount of new line but what we're doing is doing it in the most efficient possible way and to bring the maximum possible commuter benefits."

The new Integrated Rail Plan includes:


*  The completion of HS2 from Crewe to Manchester, with new stations at Manchester Airport and Manchester Piccadilly

*  A new high-speed line between Birmingham and East Midlands Parkway

*  The delivery of Northern Powerhouse Rail via a new high-speed line between Warrington, Manchester and Marsden in Yorkshire

*  The upgrading or electrification of the existing Midland Main Line, East Coast Main Line and Transpennine Main Line

*  A new mass transit system for Leeds and West Yorkshire

*  Money for a programme of fares and ticketing reform, including contactless pay-as-you-go ticketing in the North and Midlands

*  A study to look at the best way to take HS2 trains to Leeds, including capacity at Leeds Station

In addition to the HS2 changes, there is also a scaling back of a new Trans-Pennine rail route between Manchester and Leeds as part of the NPR project to improve links between major northern cities.

The route between Leeds and Manchester will now be a combination of new track and enhancements to existing infrastructure.

"We're cutting journey times from Manchester in half from 2 hours 9 min to 1 hour 11 min," said Mr Johnson.

"We're also cutting times from Manchester to Leeds from 55 min to 33 min and [creating] a crossrail for the Midlands for the first time."

He added that there would also be a new high-speed line taking the time needed to travel from the West Midlands to East Midlands, from 1 hour 14 min down to 26 min.

"What that means is you will be able to have HS2 trains all the way up to Sheffield, taking half an hour off the time up to Sheffield," Mr Johnson stressed.

"You will have a crossrail for the north, a crossrail for the Midlands and then the HS2."


Tory MP Robbie Moore, whose Keighley seat sits close to Bradford, said he was "deeply disappointed" by the plan, which had "completely short-changed" his constituents.

Bradford had expected to be included on the proposed Leeds to Manchester route and to see a station built to accommodate new trains.

"We are one of the most socially deprived parts of the UK and we must get better transport connectivity," Mr Moore said.

Delivering the Integrated Rail Plan (IRP) in the Commons, Transport Secretary Grant Shapps told MPs it was an "ambitious and unparalleled programme" to overhaul inter-city links across the north and Midlands, and "speed up the benefits for local areas and serves destinations people most want to reach".

Work has already started on the first phase of HS2, linking London and the West Midlands. The next section will extend the line to Crewe.

The final phase was to take HS2 to Manchester and Leeds.

A proposed HS2 train


Commenting on plans for rail links between the East Midlands to Leeds, Mr Shapps said: "We'll study how best to take HS2 trains into Leeds as well".

However, that is likely to be via upgrades to existing rail network, a move condemned by MPs and regional business leaders who said a high-speed line was vital to the economic growth of the Midlands and north England.

Labour MP Hilary Benn, who represents Leeds Central, said: "Today that promise has been broken, and Leeds and the North have been betrayed."

Andy Bagnall, director general of the Rail Delivery Group, which represents train operators, said: "While millions of people will benefit from this major investment in boosting connectivity between major cities in the North of England and the Midlands, leaving out key pieces of the jigsaw will inevitably hold back the ability for the railways to power the levelling up agenda and the drive to net zero."

Analysis

by Katy Austin, BBC transport correspondent

The government's argument is that faster delivery at lower cost is now the best approach. It also makes the case for putting cash towards better local services, not just high speed inter-city connections.

That won't wash with those who will accept nothing but the original proposals for both HS2 and Northern Powerhouse Rail - with their full capacity benefits, as well as journey times. They feel a promise is being broken.

Bradford is one example of this; a city whose leaders view a new, full high-speed link to both Manchester and Leeds as essential to regeneration.

Opponents of HS2 - a controversial project - will see today's news as a relief. Although the door has not been fully closed to the eastern leg being completed at some future date.

However, businesses in Yorkshire who hoped HS2 would bring jobs, investment and confidence, albeit not for a while, feel that opportunity has just been diminished.

Labour also point out that despite the £96bn label, much of this money had already been earmarked for HS2.

'Waste of money'


News that part of HS2 was being scrapped was met with "elation" by campaigners against the line.

Sandra Haith, from an anti-HS2 group in Bramley, Rotherham, said she was pleased, "not only as a resident of Bramley, but as a taxpayer. It's a complete waste of money".

Sandra Haith (far right) has spent years fighting the plans


She said: "The eastern leg costs a lot of money and it basically connects two cities. We can't get on it. We've got all the pain and no gain."

However, business people warned about the economic loss from scrapping the HS2 line. James Greenhalgh, who runs the Flamingos Coffee House, in Leeds, told the BBC it would deter investment in the city.

"We want to encourage other businesses to move up from London, up to Leeds, get people moving around and coming to our city centre. It is really tough, it is stopping businesses from expanding," he said.

There was praise, though, from business leaders at regional trade body Midlands Connect.

Chairman Sir John Peace said: "Although these plans are different in some respects to what we'd expected, there are a lot of positives in here and lots of things to be excited about - a new high-speed connection between Birmingham and East Midlands Parkway, direct links onto HS2 for Derby, Nottingham, and Chesterfield and a commitment to the Midlands Rail Hub."


'We're building in the most efficient possible way'


Newsletter

Related Articles

0:00
0:00
Close
Apple to Pay Google About One Billion Dollars Annually for Gemini AI to Power Next-Generation Siri
UK Signals Major Shift as Nuclear Arms Race Looms
BBC’s « Celebrity Traitors UK » Finale Breaks Records with 11.1 Million Viewers
UK Spy Case Collapse Highlights Implications for UK-Taiwan Strategic Alignment
On the Road to the Oscars? Meghan Markle to Star in a New Film
A Vote Worth a Trillion Dollars: Elon Musk’s Defining Day
AI Researchers Claim Human-Level General Intelligence Is Already Here
President Donald Trump Challenges Nigeria with Military Options Over Alleged Christian Killings
Nancy Pelosi Finally Announces She Will Not Seek Re-Election, Signalling End of Long Congressional Career
UK Pre-Budget Blues and Rate-Cut Concerns Pile Pressure on Pound
ITV Warns of Nine-Per-Cent Drop in Q4 Advertising Revenue Amid Budget Uncertainty
National Grid Posts Slightly Stronger-Than-Expected Half-Year Profit as Regulatory Investments Drive Growth
UK Business Lobby Urges Reeves to Break Tax Pledges and Build Fiscal Headroom
UK to Launch Consultation on Stablecoin Regulation on November 10
UK Savers Rush to Withdraw Pension Cash Ahead of Budget Amid Tax-Change Fears
Massive Spoilers Emerge from MAFS UK 2025: Couple Swaps, Dating App Leaks and Reunion Bombshells
Kurdish-led Crime Network Operates UK Mini-Marts to Exploit Migrants and Sell Illicit Goods
UK Income Tax Hike Could Trigger £1 Billion Cut to Scotland’s Budget, Warns Finance Secretary
Tommy Robinson Acquitted of Terror-related Charge After Phone PIN Dispute
Boris Johnson Condemns Western Support for Hamas at Jewish Community Conference
HII Welcomes UK’s Westley Group to Strengthen AUKUS Submarine Supply Chain
Tragedy in Serbia: Coach Mladen Žižović Collapses During Match and Dies at 44
Diplo Says He Dated Katy Perry — and Justin Trudeau
Dick Cheney, Former U.S. Vice President, Dies at 84
Trump Calls Title Removal of Andrew ‘Tragic Situation’ Amid Royal Fallout
UK Bonds Rally as Chancellor Reeves Briefs Markets Ahead of November Budget
UK Report Backs Generational Smoking Ban Ahead of Tobacco & Vapes Bill Review
UK’s Domino’s Pizza Group Reports Modest Like-for-Like Sales Growth in Q3
UK Supplies Additional Storm Shadow Missiles to Ukraine as Trump Alleges Russian Underground Nuclear Tests
High-Profile Broodmare Puca Sells for Five Million Dollars at Fasig-Tipton ‘Night of the Stars’
Wilt Chamberlain’s One-of-a-Kind ‘Searcher 1’ Supercar Heads to Auction
Erling Haaland’s Remarkable Run: 13 Premier League Goals in 10 Matches and Eyes on History
UK Labour Peer Warns of Emerging ‘Constituency for Hating Jews’ in Britain
UK Home Secretary Admits Loss of Border Control, Warns Public Trust at Risk
President Trump Expresses Sympathy for UK Royal Family After Title Stripping of Prince Andrew
Former Prince Andrew to Lose His Last Military Title as King Charles Moves to End His Public Role
King Charles Relocates Andrew to Sandringham Estate and Strips Titles Amid Epstein Fallout
Two Arrested After Mass Stabbing on UK Train Leaves Ten Hospitalised
Glamour UK Says ‘Stay Mad Jo x’ After Really Big Rowling Backlash
Former Prince Prince Andrew Faces Possible U.S. Congressional Appearance Over Jeffrey Epstein Inquiry
UK Faces £20 Billion Productivity Shortfall as Brexit’s Impact Deepens
UK Chancellor Rachel Reeves Eyes New Council-Tax Bands for High-Value Homes
UK Braces for Major Storm with Snow, Heavy Rain and Winds as High as 769 Miles Wide
U.S. Secures Key Southeast Asia Agreements to Reshape Rare Earth Supply Chains
US and China Agree One-Year Trade Truce After Trump-Xi Talks
BYD Profit Falls 33 % as Chinese EV Maker Doubles Down on Overseas Markets
US Philanthropists Shift Hundreds of Millions to UK to Evade Regulatory Uncertainty in Trump Era
Israeli Energy Minister Delays $35 Billion Gas Export Agreement with Egypt
King Charles Strips Prince Andrew of Titles and Royal Residence
Trump–Putin Budapest Summit Cancelled After Moscow Memo Raises Conditions for Ukraine Talks
×